Projectdox City Of Miami (2024)

1. ProjectDox Login

  • Welcome to the City of Miami Online ePlan Permitting System. Online Permit ... Click to Download ProjectDox User Guide. Click the video training links ...

  • July 15, 2024

2. How to use ProjectDox - City of Miami

  • This is where you can access your projects and upload documents, drawings, etc. Use this section to review and manage applications, (now called projects), that ...

  • ProjectDox (part of ePlan) is a web-based solution that lets customers initiate and complete the plan submission, review and approval process online, rather than using a manual, paper-based process. All permit applications (and more) use ProjectDox to upload drawings and documents.

3. Submit Plans (Drawings) & Documents Electronically - Miami

4. [PDF] February 2021 - City of Miami

  • major ProjectDox tasks utilizing steps and pictures of the ProjectDox software. The ProjectDox Guide contains seven (7) modules: 1. Module I: Permitting ...

5. User Log In - City of Miami

  • Sign In. Need an account? You can apply for new permits and manage existing permits online with ease. Request an Account. Permit Look-up. Search.

  • City of Miami Application Base

6. Announcing ePlan! - City of Miami

  • ePlan/ProjectDox/OAS Portal. Enter ePlan. Building Permits.

  • Announcing the new Electronic Plan Review (ePlan).

7. ProjectDox Login - Bitly

  • Welcome to the City of Miami Online ePlan Permitting System. Online Permit ... Click to Download OAS User Guide. Click to Download ProjectDox User Guide.

  • July 15, 2024

8. iBuild Portal Link - City of Miami

  • How to use ProjectDox · Elevators Sub-menu. Back to Elevators; Obtain an Annual Elevator Certificate · Land Development Sub-menu. Back to Land Development ...

  • Link to the iBuild portal for Building permits.

9. Home - EPS - Miami-Dade County

  • Miami-Dade Department of Regulatory and Economic Resources. Plan Status and Application Submittal Portal. Onsite Sewage Treatment and Disposal Systems (OSTDS) ...

  • RER ELECTRONIC PERMITS & REVIEWS SYSTEM

10. Building Permits | North Miami Beach, FL

  • Permit Forms · Permit Requirements · Inspection Guidelines

  • A building permit is required for all new construction and for any repairs or reconstruction which alters a structure.

Projectdox City Of Miami (2024)

FAQs

What is ProjectDox? ›

ProjectDox (part of ePlan) is a web-based solution that lets customers initiate and complete the plan submission, review and approval process online, rather than using a manual, paper-based process. You will need a ProjectDox account to upload all documents and drawings for Building, Planning, and Zoning applications.

How do I delete a file on ProjectDox? ›

Applicants have the ability to delete files during the pre-screening process only. Once the initial review cycle has been completed, files can only be deleted by ProjectDox staff. If you need a file removed, please send a request to darnell.watkins@dc.gov.

What are the drawing requirements for DCRA permit? ›

Drawings minimum size should be 18" x 24". This is not mandatory but will help facilitate more efficient review of the plans. The bottom right corner of all drawings should be reserved for DCRA Electronic Stamp.

Do you have to pull a permit to replace a water heater in Florida? ›

Do I need a permit to replace my old water heater? Yes. A permit is required to ensure that the equipment and installation procedures are in compliance with the Florida Building Code and any other applicable City requirements.

How long does it take to get a permit in Miami? ›

NOTE: For a Building permit application it usually takes 14 business days for the first cycle of review to be completed. For a Special permit application, it usually takes 35 business days for the first cycle of review to be completed.

Do you need a permit for a shed in the city of Miami? ›

A building permit is required to install a shed/utility storage or aluminum terrace/patio covers and related projects.

How do I update my contractor information in Miami? ›

Add/Update Your Building Professional

Once in iBuild, select 'Manage Application' and select Add/Update Contractor (GC, subs like electricians, etc.). You will need your contractor's company + qualifier license number, as they have to be registered to do work in the City of Miami.

How do I contact the city of Miami? ›

By dialing 311 or 305-468-5900 (outside Miami-Dade County), you can receive personalized customer service in English, Spanish or Haitian Creole. The 311 Contact Center is open Monday through Friday from 7 a.m. to 7 p.m. and Saturday from 8 a.m. to 5 p.m., while closed on Sundays and holidays.

How do I submit a notice of commencement to Miami-Dade? ›

Documents are recorded at the Clerk of the Courts, MIAMI-DADE COUNTY RECORDER, COURTHOUSE EAST, 22 N.W. First Street, 1st Floor, Miami, FL 33128. You can record the Notice of Commencement by mail. The original Notice should be sent to the County Recorder, P.O. Box 011711, Flagler Station, Miami, Florida 33101.

Top Articles
Latest Posts
Article information

Author: Trent Wehner

Last Updated:

Views: 6261

Rating: 4.6 / 5 (76 voted)

Reviews: 83% of readers found this page helpful

Author information

Name: Trent Wehner

Birthday: 1993-03-14

Address: 872 Kevin Squares, New Codyville, AK 01785-0416

Phone: +18698800304764

Job: Senior Farming Developer

Hobby: Paintball, Calligraphy, Hunting, Flying disc, Lapidary, Rafting, Inline skating

Introduction: My name is Trent Wehner, I am a talented, brainy, zealous, light, funny, gleaming, attractive person who loves writing and wants to share my knowledge and understanding with you.